Schedule for the machines

$
0
0

We only use currently operation schedule for the production work orders.

we use “Current Operations” ?  Production control > Common > Current operations.

I was looking to see if I could find a way to view the schedule for a machine (resource) without using the gantt charts. as we don't have job schedule.  I have used current operations before and thought this might be a good option as it breaks down the production orders into operations giving start and end dates.   I looked at Production order which was the order we tested  it gives me 36 lines of the run operation (op10)resource ,and for the sub operation (op20)1 time (resource group).  I do not understand the 36 lines  for the run operation ? why does it show it so many times ?  

We only want to see the machine schedule for the week or month, what is the best way for that?


Viewing all articles
Browse latest Browse all 175888

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>