we recieve sales order and once the order is confirmed we release it to manufacturing.
the Finished goods has BOM which has items and phantom BOM's(typical BOM). at lower levels we use Kanbans .
in the manufacturing/Production parameters Automatic BOM consumption has been set to 'Never' so i assume that the items are consumed when the picking list is posted during the kanban order processing.
the issue is that the items under phantom boms are not consumed while doing so this is affecting the master planning.
Is there some setup that we might be missing?