When calculating master planing in a package, the package runs for 20 minutes (instead of the usual 80 minutes) and the status becomes "Error". In this case, the log does not open and there are no errors.
Consolidated scheduling is started in 4 threads, and each thread gradually falls into the error.
Where can I see what would make sense of the problem?
I think that the problem is related to the integrity of the database, because it arose after the SQL base backUp procedure hung on the server
Checking the integrity of the database and means of DAX and means SQL conducted, did not help.
In the work of other DAX functions there are no problems