hi all
my scenario is,
i have 16 production lines, with space at each for approx 2-4 pallets depending on the line.
Production orders i create could run for days/weeks, hence the quantity of raw materials required to be moved to the production location will run into many pallets. eg over the course of a day i will be required to move 10 + pallets of bottles to the line, but i would only ever want 1 pallet moved to the production line at a time.
if the production order i create, required a total of 10 pallets (10 license plates) of bottles, which would be consumed over 8 hours, can the Dynamics release raw material pick be configured to create a movement per license plate rather than advise me to move the 10 lps in one movement?
any ideas?
mal