Quantcast
Channel: Microsoft Dynamics AX Forum - Recent Threads
Viewing all articles
Browse latest Browse all 175888

Costing sheet : subtype setup for surcharge node type

$
0
0

Hi there,

Does anyone has ever used that setup on D365FO ?

My BOM is : FG1 composed by RAW-MAT1 (cost group A) , RAW-MAT2  (cost group B) , FG2 (cost group A) 

FG2 is composed by RAW-MAT3  (cost group A)  and RAW-MAT4  (cost group A) .

In the costing sheet, I've a cost node "A1" based on the A cost group.

My surcharge node  is 10% on "level" with an absorption basis on A1, level.

When running the Bom calculation on FG1 (planned version cost, multilevel, based on calculation group), it works well, the correct amount is calculated twice, for the FG1 and FG2.

But when I switch to Total for the surcharge node in the costing sheet -> no difference (I've  tried to play with the absorption basis but failed) -> I should have expected only one line for the surcharge A1 on the costing sheet view with a different amount.

When I switch to sublevel for the surcharge node in the costing sheet -> the surcharge is displayed twice with a amount equal to 0 : I should have expected only one line for the subcomponent FG2 for the surcharge.

If anyone has an idea of what I am missing it would be great.

Cheers.

Yohann


Viewing all articles
Browse latest Browse all 175888

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>