I have a sales order line with an open quantity of 2. And the work detail for the line has a work status of 'closed'. I want to change the quantity of the sales line to 1 but it won't let me. Can I change the work status so that I can change the quantity to 1 and then change the sales line quantity to 1?
Do I need to change the work status in code?