Hi,
I am in the process of doing upgrade from AX 2012 feature pack to AX 2012 R3. Following the steps mentioned in the below link and creating the development system for code upgrade:
https://technet.microsoft.com/en-us/library/jj733502.aspx
Under code upgrade checklist for in-place upgrade, there are steps to compile the application and full CIL before detecting code upgrade conflicts and resolving them. Now during compilation and CIL, I am getting errors in code which are related to SYS changes conflicting with VAR layer changes. I thought, I have to resolve these after detect code upgrade conflict step.
Can anyone please let me know if I need to ignore compile time errors at this stage and move to next step or am I missing something?
Thanks,
Baber.