Hi All,
After some serious testing on many different levels and looking into all the possibilities that the AX Community has laid out for me I was able to fix this error when it popped up on us again today when trying to END a production job!
This issue seems to be very sporadic in nature because sometimes the error is thrown and sometimes it isn't even when repeating the same behavior with other production jobs.
Now to explain how we are creating the issue and how to go about fixing it if your working in this same manner.
- Job is created for a specific quantity and that quantity gets changed for the production order.
- We will edit the BOM (Bill of Materials) to match the change in the overall production quantity so costing is correct.
However; ***Making these changes to the BOM at this point in the work flow causes this error for us***
To fix this error it helps to know what changes you have made to BOM and set them back to the original status and estimate the job again. ( I believe this error is caused because active cost being generated for the product/item is lower than the total cost of the raw material ) Correct me if I'm wrong!!
After doing this the job ENDS without issue.
Hope this helps some of you!