Hi,
Requirement: Intended sub-contractor did not have the capacity to complete the operational quantity in the production order. The operation is completed with an alternative sub-contractor.
The condition is that the production order cannot be rolled back to created state due to integration at the earlier operation.
Please let me know how to put an additional operation after the production order