Hi all,
I'm facing an issue with MRP. I'm running a regenerative master plan for whole items and there are certain products that are not being fully exploded on their bom levels.
I took one product for example. That product has 3 raw materials and 1 semi-finished product on its bom lines. The three raw materials were exploded however the semi-finished product wasn't.
My master plan has the "explosion" check box checked and the field filled with '10' (days) on the "Time fences" tab.
Up to know, i need to re-run the master plan with the principle set to "net changed". That time the explosion is full done.
Is there any way to get the full explosion on the first regenerative run? Am I missing some setup?