Hi Everybody,
sorry for so 'easy' question - but we discussed lastly the meaning of BOM level stored in InventTable for given item (Released Product form - tab Engineer). Some of us understand BOM level as:
A. the highest BOM level in last Master Planning - on which the item has been proceeded on last MP session. If the item is product (top level) and is not included in other BOM's as sub-item (in BOM line) - the BOM level shall be equal 0.
Some understand BOM level otherwise:
B. the deepest BOM level in its BOM's - if the item has BOM with 3 levels - the BOM level stored in top item shall be equal 3.
Could you tell me how really BOM level is meant ?
Thanks a lot for any help
Witold Adamiak