Plan Group and Priority

$
0
0

Hi All,

I'll be needing some help in understanding the function and set-up for plan group and priority.

I run a test using the following:

a) Scenario 1

I have 50 kg for test3 and 100kg in test4 in the inventory.

I created an SO of 150 kg test item (FG).

When I ran master scheduling for the item, the  system gave me a purchased order of 100 kg for test3, then planned transfer of 150 kg to my production warehouse.

Is there anything wrong with the set-up? I'm expecting the system to issue a planned transfer of 50 kg (test3) and 100kg (test4) to fulfill 150kg of test item.

b) Scenario 2

Instead of test3 and test4, i used test 1 and test 2 for the items in the formula line; where:

test1       0 kg in inventory, priority

test2       150 kg in inventory, substitute

After i run master scheduling, the system gave me a purchased order of 150kg for test1.

As per the result from the above scenarios, it seems that the second priority was not included in the planning.

Are there any fields that i missed out to make the use of substitute work?

Thank you in advance.