Hello,
we have an Issue, cause a production order is two times "Report as finished", which happens from to time, cause "end Job" was not activated at the first time.
I Took a look in the log, and there is two times release of this order too?
Is there a Parameter or sth, which causes this or was there a Change in CU9? According to release notes of CU9 i do not find anything.
Thanks