hi
we have batch controlled production items (displays) that contain other batch controlled finished items.
the displays BOM is set to be consumed out of a specific warehouse, but when i start the job, the BOM components are being allocated out of various warehouses and automatically picking the batches to be allocated to production
what i want is the ability to assign the batches that i want to use in the production of the Display item
how can i manage this?
mal