Hi All,
I have a requirement in production like the user want to create an Item X with A, B, C and D as the Components and the Component B also has a route attached with it for the value-added service.
That is Like X will be created with the assembling process of items A, B, C, D
And B will have the process like Drilling, Polishing, and cutting.
For this i have created a item X with BOM of A,B,C and D and a route for assembling.
I have created another route with operations Drilling, Polishing, and cutting.
Now when I create the production order for X the route assembling route is included but how can i create the Route card for Item B which has the operations Drilling, Polishing, and cutting.
So that i can process the Operation of item D and finally assemble item X with all the items A, B, C and D.