If we have 2 copies of the MR Reporter on the same server instance and would like the test to refer company in test for test and production for production respectively. However when we run the MR Report in roduction it stills refers back to the test eventhough all have been configured seperately. We even tried to remove the test database, however even after this M R in production was not running. It seems that soimehow there is some cache that the system refers to keeps on looking for test.
Finally we decided to seperate both on 2 physical servers and they are able to both run independently. This has creating a lot of duplication of unnecessary effort and time. Not all customers will be able to provide seperate physical servers.
There must be some routine to be able to perform this activity and be able to do the same on same server.