The standard cost rollup process is ungainly at best. So far we have a manual process to recalculate all the levels in each site. Our two factories share assemblies and materials so the costs are similar.
Does anyone on 2012 R3 have any tips, techniques or code to make the process easier and help work around problems in costing as they are found?
Thanks in advance!
Konrad